Quantcast
Channel: sheridan college – Sheridan Insider
Viewing all articles
Browse latest Browse all 4665

Annual Hydro Shutdown at Davis, May 28-29

$
0
0

Please be advised that Facilities Services will be conducting its annual hydro shutdown for the Davis Campus in order to perform maintenance on the high voltage electrical switches and transformers. This service is necessary to ensure our electrical systems are operating as required and at peak performance.

Building Hydro will be shut-down on Saturday, May 28, 2016 beginning at 11:00pm and continuing through until the following morning, Sunday, May 29, 2016 at 6:00am. All building power and services will be off line during this time, but will be operational by 6:00am.

Again, this is a complete campus shut-down, all electrical services will be turned off to all buildings during the above noted times. It is advised that all computers, electronic equipment be turned off prior to our shut-down.

Only authorized personnel will be permitted within the college facilities during the above mentioned times.

Unauthorized personnel will not be permitted within the college facilities during this shut-down for safety reasons.

Should you have any questions, please contact:

Gord Ide

Senior Manager, Facilities Operations & Sustainability
Facilities Services
905-845-9430 (x2251)
Brampton, Oakville, Mississauga
gordon.ide@sheridancollege.ca


Viewing all articles
Browse latest Browse all 4665

Trending Articles