Quantcast
Channel: sheridan college – Sheridan Insider
Viewing all articles
Browse latest Browse all 4665

REMINDER: Upcoming Hydro Shutdowns – STC on Thursday, April 10

$
0
0

Please be advised that Facilities Services will be conducting its annual hydro shutdowns at each of our campuses in order to perform maintenance on the high voltage electrical switches and transformers. This service is necessary to ensure our electrical systems are operating as required and at peak performance.

Complete Building Hydro will be shut-down on the following dates for the respective campuses beginning at 11:00 p.m. and continuing through until the following morning at 6:00 a.m.
All building power and services will be off line during this time, but will be operational by 6:00 a.m.

STC CAMPUS: THURSDAY APRIL 10, 2014
DAVIS CAMPUS: SATURDAY, MAY 24, 2014
TRAFALGAR CAMPUS: THURSDAY JUNE 12, 2014
HMC CAMPUS: THURSDAY JUNE 19, 2014

Again, this is a complete campus shut-down, all electrical services will be turned off to all building areas during this time frame.It is advised that all computers, electronic equipment be turned off prior to our shut-downs.Only authorized personnel will be permitted within the facilities during the above mentioned times. No staff or students will be permitted within the college facilities during this shut-down for safety reasons. Please advise students of this shut-down.

Gord Ide
Manager, Building Maintenance & Services
Facilities Services


Viewing all articles
Browse latest Browse all 4665

Trending Articles