Renovation projects for June

$
0
0

Please note below a list of renovation projects that will be ongoing throughout the month of June.  Project notifications will be posted in common areas relative to the project locations in order to provide further details on the scope of work, affected areas and duration of the scheduled work.  Please be aware of the work at hand and observe any signage redirecting pedestrian traffic away from potential health and safety hazards.  All work has been scheduled as much as possible to avoid interruption with ongoing classes, however if there are any concerns please do not hesitate to contact Facilities Services.

Location Brief Description of Work
TRAFALGAR CAMPUS
Athletics Building Mechanical upgrades effecting HVAC, chilled water & heating
A-wing & Athletics Building New electrical service and water main replacement
A-wing A117 & A143 classroom renovations
Annie Smith AA1b classroom renovation
B-wing Basement Office upgrades
B-wing & J-wing Miscellaneous washroom upgrades
B-wing B122d office renovation
B-wing B115b sound booth installation (affect B115a)
B-wing New One Card office / Grassroots
B-wing BB10 Studio renovation
B-wing B244 office reconfiguration
C-wing C105 Library office renovation
C-wing C224 & C225 classroom renovation
C-wing HVAC, building automation upgrades & corridor lighting
G-wing HVAC, building automation upgrades & corridor lighting
G-wing Building closure & shut down from June 20st to July 7th
J-wing J218 classroom renovation (affect J216)
S-wing S318 & S318a classroom/office/storage renovation
S-wing S403 office renovation
South side of campus-Exterior Cabling along trails
Campus wide Chilled water renovations (limited access in tunnels)
Campus wide Heat exchanger renovations

 

Location Brief Description of Work
DAVIS CAMPUS
B-wing  (chemistry wing) Pump relocation & piping rework
B-wing (Hollend room) Faculty office renovation
B-wing Elevator refurbishment (additional information will be posted)
B-wing B104 office reconfiguration
B-wing B219 office reconfiguration
C-wing C123 & C131 interior refurbishing
C-wing HVAC, building automation upgrades & corridor lighting
Campus wide Chilled water renovations