Please note below the list of renovation projects that will be ongoing throughout the month of October. Project notifications will be posted in common areas relative to the project locations in order to provide further details on the scope of work, affected areas and duration of the scheduled work. Please be aware of the work at hand and observe any signage redirecting pedestrian traffic away from potential health and safety hazards. All work has been scheduled as much as possible to avoid interruption with ongoing classes, however if there are any concerns please do not hesitate to contact Facilities Services.
Location | Brief Description of Work |
TRAFALGAR CAMPUS | |
A-wing & Athletics Building | New electrical service |
B-wing | BB10 studio renovation |
B-wing | B244 office upgrades |
C-wing | Flooring replacement in corridors |
C-wing | HVAC, building automation upgrades |
C-wing/E-wing | Replacement of Electrical Transfer Switch (Thanksgiving weekend) |
Exterior | Updating building signage |
Exterior | North fence repairs/replacement |
DAVIS CAMPUS | |
B-wing | Pump relocation & piping rework |
B-wing | B136 mechanical lab upgrade |
B-wing | B228 chemistry lab modifications |
B-wing | B145 faculty office renovation (Hollend room) |
B-wing | B198 Animal Care Radiology Lab |
C-wing | New one-card office (across from health centre) |
HMC | |
A-wing | New Health Centre |