Please be advised that Facilities Services will be conducting its annual hydro shutdown for the Davis Campus in order to perform maintenance on the high-voltage electrical switches and transformers. This service is necessary to ensure our electrical systems are operating as required and at peak performance.
Building hydro will be shut down on Saturday, May 23, 2015 beginning at 11 p.m. and continuing through until the following morning on Sunday, May 24, 2015 at 6 a.m.
All building power and services will be off line during this time but will be operational by 6 a.m.
Again, this is a complete campus shutdown; all electrical services will be turned off to all buildings during the above noted times.
It is advised that all computers, electronic equipment be turned off prior to our shutdown.
Only authorized personnel will be permitted within the general college facilities during the above mentioned times.
Unauthorized personnel will not be permitted within the college facilities during this shutdown for safety reasons.
Should you have any questions, please contact:
Gord Ide |
Manager, Building Maintenance & Services |
Facilities Services |