Quantcast
Channel: sheridan college – Sheridan Insider
Viewing all articles
Browse latest Browse all 4665

Annual Campus Hydro Shutdowns

$
0
0

Please be advised that Facilities Services will be conducting its annual hydro shutdowns for the following campuses in order to perform maintenance on the high voltage electrical switches and transformers. This service is necessary to ensure our electrical systems are operating as required and at peak performance.

Trafalgar:
Date:
Saturday, May 6, 2017
Time: 11:00pm – 6:00am

Davis:
Date:
 Saturday May 27, 2017
Time: 11:00pm to 6:00am

HMC:
Date:
 Thursday June 8, 2017
Time: 11:00pm – 6:00am

Building Hydro will be shut-down as per the above schedule.
All building power and services will be off line during this time, but will be operational by 6:00am.

Again, this is a complete campus shut-down, all electrical services will be turned off to all buildings during the above noted times.

It is advised that all computers, electronic equipment be turned off prior to our shut-down.

Only authorized personnel will be permitted within the college facilities during the above mentioned times.

Unauthorized personnel will not be permitted within the college facilities during this shut-down for safety reasons.

Should you have any questions, please contact Gord Ide at

gordon.ide@sheridancollege.ca


Viewing all articles
Browse latest Browse all 4665

Trending Articles