Please be advised of the following renovation and construction project taking place this Tuesday, August 14, 2018 at the Trafalgar Campus:
Trafalgar Campus – E-Wing Second Floor Power panel shutdown, August 14 at 5:00 am.
As part of our ongoing construction activities this summer, we are required to shut down a power panel on the second floor of E-Wing at the Trafalgar Campus on August 14 to refurbish the existing electrical panel. We will be completing this work on Tuesday, August 14 at 5:00 am and power outlets are to be restored by 7:30 am.
E-Wing second floor will have limited access to power outlets; however, during this time lighting and emergency power will remain operational.
Thank you in advanced for your cooperation. We apologize for the any inconveniences. If you have any questions about this shutdown please contact constructionfeedback@sheridancollege.ca.
Sincerely,
Facilities Services