Quantcast
Channel: sheridan college – Sheridan Insider
Viewing all articles
Browse latest Browse all 4665

HMC Roof Replacement, B-Wing, August 28 – September 14

$
0
0

The upper mechanical roof on B-Wing at HMC that was damaged in the windstorm earlier this year will be replaced. This project will last approximately two weeks. All work is to be performed during regular hours. There will be overhead hoarding and protection at ground level to ensure public safety during the project. The roofing replacement will be directly over the mechanical penthouse reducing disruptions to classes below.

Accessible parking spaces will be unavailable during this time at B-Wing. Sheridan has partnered with the City of Mississauga to relocate any displaced students or staff by granting them access to the municipal parking lot beside B-Wing. Drivers may park in this lot free of charge provided both a valid Sheridan parking pass and accessible parking pass are visible. Please see the map below to view the affected area.

If you have any questions about the above projects, please contact constructionfeedback@sheridancollege.ca.


Viewing all articles
Browse latest Browse all 4665

Trending Articles